CALL TODAY TO SEE HOW MUCH YOU CAN SAVE (321)-231-4509

D3 Solar
D3 Solar
  • Home
  • Solar
    • Why Solar?
    • Solar Financing
    • Solar Installation
  • About Us
  • FAQ
  • Contact Us
  • More
    • Home
    • Solar
      • Why Solar?
      • Solar Financing
      • Solar Installation
    • About Us
    • FAQ
    • Contact Us
  • Home
  • Solar
    • Why Solar?
    • Solar Financing
    • Solar Installation
  • About Us
  • FAQ
  • Contact Us

The solar process

Solar

Savings Report

With the D3 Solar Savings Report gives you everything you need to know about your solar savings potential. You’ll see how solar works, get a custom panel layout, an estimated yearly production as well as a new estimated bill. You’ll also get a peek at incentives, 25-year savings, and a whole lot more.

Approval Process

We want to make sure you get the right solar experience. After you decide to go solar we’ll help you decide what loan product and payment works for you and your budget. You’ll then fill out a quick application and most approvals come back same day. 

Signatures

No one likes reading through and signing thousands of documents for what feels like hours. We’ll quickly walk you through the contract and loan documentation that will need your signature. Most can be signed electronically and we make this step as painless and seamless as possible

Site Survey

With documents signed it’s time to get your new system dialed in. Site surveys will be done by your D3 Solar representative who will take some photos around your home. They’ll capture things like electrical panels, breakers, your roof, and attic. 

Final Design and Permit

After the site survey a final engineered design, known as a CAD, will be created for your roof. The CAD is designed in accordance with all regulations required by the state and local utility company to make sure we don’t run into any issues or roadblocks.

Once the CAD is approved your permitting applications are finished and we’ll submit the final plans.

Installation

Once those permits are received we’re ready to install your new solar system. We’ll work with you to find an installation date that fits your schedule. And here is the best part; most systems are finished in one day! 

Activation

Once your new solar system is installed we’ll submit for Permission to Operate, or PTO, with your utility company. The approval of PTO’s varies by utility company, but we work hard to make sure it’s approved as quickly as possible.

Once approval comes through you are free to flip the switch and start producing your own power.

  • Privacy Policy
  • Terms and Conditions

D3 Solar

1523 Hawkesbury Court, Winter Garden, Florida 34787, United States

321-231-4509

Copyright © 2024 D3 Solar  - All Rights Reserved.

License Number: CVC 57226

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept